Chrome-free Passivation in #2 Electrolytic Tinning Line
Services:
- Authority Documentation
- Laser Scan
- P&ID
- Reverse Engineering
- Basic Design / Engineering
- Building Permit Documentation
- Detail Engineering
- Supervision
- Maintenance Manuals
- Operation Manuals
- As Built
Client:
U. S. Steel Košice, s.r.o.
Year:
2015/2016/2017
Project type: